LAFI ENGINEERING, founded over 60 years ago, has always endeavoured to work in such a way as to gain, and retain, the loyalty of its clients.

We have never ceased building on our reserves of high-value-added skills in the engineering trade. That explains why we have remained deliberately loyal to the basic trades, fluids and electrical, regularly incorporating new environmental and regulatory requirements as and when necessary. In recent years, we have focused on developing an environmental and thermal division and trained our staff in the use of BIM which allows us to meet the increasing needs, desires and expectations of our clients.

Lafi Engineering predominantly works for two client profiles: institutional clients and real estate investment & management companies on the one hand and major users on the other hand. We endeavour to provide answers to any technical problems encountered by our clients’ in respect of their property portfolios, which mainly comprise commercial assets, shopping centres and hotels. Lafi Engineering is fortunate enough to have at its disposal highly-skilled in-house experience (average age of 43) to meet often extremely complex demands and which enable us to work on major reconfiguration projects, but also projects involving high-level challenges (such as replacing a mains switchboard on an occupied site or a trading room, for example).

BUILDING SERVICES DESIGN AND ENGINEERING SERVICES

  • Feasibility Studies
  • Programme definition
  • Procedures in relation with utility service providers
  • Design studies (preliminary design/detailed design/tender package)
  • Tender process and contract negotiation
  • Management and coordination of works
  • Testing, handover of works

FACILITY AUDITS

  • Building systems audit
  • Estimation of works to bring properties into compliance
  • Analysis of potential improvements

THERMAL STUDIES & DIAGNOSTICS

  • Required calculations (Thermal regulations, existing/ RT 2012 thermal regulations)
  • Comparative energy analysis, renewable energy feasibility
  • Attainment of building certifications (BBC, E+C-, NF HQE, BREEAM, LEED, etc.)
  • Energy performance analysis
  • Dynamic thermal simulations, summertime thermal comfort analysis, daylight factor calculations
  • Energy consumption calculations

Project Management

  • Consultancy services for project owners in respect of the supervision of works within the framework of real estate operations

ASSISTANCE – MAINTENANCE

  • Drawing up of individualised maintenance specifications
  • Tender procedures and contract negotiations

FLUIDS

  • Heating
  • Ventilation
  • Climate control
  • Smoke Control

PLUMBING & SANITATION

  • Plumbing, Sanitation
  • Wastewater, rainwater drainage

FIRE PROTECTION

  • Sprinklers
  • Gas extinguishing systems
  • Dry risers and fire systems
  • Extinguishers

ELECTRICAL POWER AND COMMUNICATIONS INSTALLATIONS

  • Electrical power installations (high voltage, medium voltage, low voltage)
  • Generating sets
  • Building management systems
  • Uninterruptible power supplies
  • Access control and/or video surveillance
  • Fire detection
  • IT systems Voice Data Image networks
  • BMS/Domotics

ELEVATOR SYSTEMS

  • Lifts
  • Goods lifts

Our achievements

PARIS - MUSEUM
22/43 rue Buffon
en cours
For :
MNHN (MUSEUM NATIONAL D'HISTOIRE NATURELLE)
With :
SO
2 200 m² SU
Missions :
Etude de faisabilité - Maitrise d'oeuvre technique
Lots processed :
CVCDes
Description :

Etude de faisabilité en vue d’amélioration des conditions climatiques de la nef de la galerie de minéralogie – Remplacement des installations de climatisation, de ventilation et de chauffage du hangar de taxidermie du Muséum national d’Histoire naturelle (bâtiment classé à l’inventaire des monuments historiques).

VILLEPINTE - PARC DES EXPOSITIONS
ZAC Paris Nord 2
en cours
For :
VIPARIS
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFACFO
Description :

Modification de la distribution électrique pour la mise en place de la ligne 17 dans le cadre du projet du Grand Paris.

LA DEFENSE - PARKINGS INDIGO
Parvis de la Défense
2017
For :
SEPADEF
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFACFODesRIASPKSSI
Description :

Remise en conformité de 6 parcs publics.

LE BOURGET - PARC DES EXPOSITIONS
Carrefour Charles Lindbergh
2019
For :
VIPARIS
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFO
Description :

Modification boucle HTA et alimentation HTA du salon SIAE 2019.

PARIS - PALAIS DES CONGRES
2 Place de la Porte Maillot, Paris 75017
2018-2019
For :
VIPARIS
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFO
Description :

Remplacement de tous les TGBT – Réalimentation des ventilateurs de désenfumage – Réalimentation de système de sonorisation (travaux en site occupé).

LA DEFENSE - CENTRE COMMERCIAL LES 4 TEMPS
Parvis de la Défense
2019
For :
ESPACE EXPANSION
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFOGE
Description :

Remplacement des groupes électrogènes et TGS

PARIS - GRAND ECRAN
Place d'Italie
2018
For :
HAMMERSON
With :
DVVD
3 500 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCPIPLB
Description :

Transformation de salles de cinéma en 2 salles de spectacle (1000 pers. et 110 pers.).

PARIS - CARROUSEL DU LOUVRE
99 rue de Rivoli
2018
For :
VIPARIS
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFO
Description :

Remplacement de cellules HTA (travaux en site occupé)

PARIS - PARC DES EXPOSITIONS
Porte de Versailles
2014-2016
For :
VIPARIS
With :
SO
N/A
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFO
Description :

Remplacement liaisons HTA – Remplacement cellules HTA – Remplacement TGT – Etude d’optimisation de puissances

SAINT DENIS - STADE DE FRANCE
Avenue Jules Rimet
2014-2016
For :
CONSORTIUM STADE DE FRANCE
With :
SO
N/A
Missions :
Etudes de faisabilité - Maitrise d'oeuvre technique
Lots processed :
CFO
Description :

Remplacement des équipements obsolètes sur la distribution HTA et les TGBT SG – Changement régime de neutre.

PARIS - RIO
2 Place Rio de Janeiro
en cours
For :
ARDIAN
With :
DTACC
9 000 m² SDP
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCGTBPLB
Description :

Restructuration d’un immeuble de bureaux

COURBEVOIE - WORKSTATION
25 Quai du Président Paul Doumer
2018
For :
HINES
With :
FRANKLIN AZZI ARCHITECTURE
40 800 m²
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCGTBPIPLB
Description :

Restructuration et extension de bureaux (immeuble IGH).

PARIS-CENTRE COMMERCIAL ITALIK
16 à 40 Avenue d'Italie
en cours
For :
HAMMERSON
With :
L35 -STUDIO JJ ORY
6 300 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
ASCCFACFOCVCGTB
Description :

Construction de commerces neufs dans le cadre de Réinventer Paris : travaux réalisés sur le Domaine public ayant nécessité un gros travail en amont de dévoiement de réseaux HT et assainissement

PARIS - CENTRE COMMERCIAL GAITE
19 rue du Commandant René Mouchotte
en cours
For :
UNIBAIL RODAMCO
With :
MVRDV - SRA
36 160 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFO
Description :

Travaux complets de restructuration et extension du centre commercial

PARIS - FORUM DES HALLES
101, porte Berger
2014
For :
ESPACE EXPANSION
With :
CALQ ARCHITECTURE
2 000 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Réaménagements de coques commerces

MONTIGNY LE BRETONNEUX - CENTRE COMMERCIAL ST QUENTIN
5, place Colbert
2014
For :
HAMMERSON
With :
SO
12 000 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Rénovation du mail

Paris Abbé de l'Epée
16 bis rue Abbé de l'Epée
en cours
For :
PARTICULIER
With :
PERROT & RICHARD ARCHITECTES
1 200 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
ASCCFACFOCVCGTBPLBSSI
Description :

Réhabilitation et réaménagement d’un hôtel particulier (bâtiment inscrit à l’inventaire des Monuments Historiques).

PARIS - MR GEORGE
17 rue Washington
2020
For :
HN6
With :
F. LEHMAN ARCHITECTE
1 650 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCGTBPLBSSI
Description :

Restructuration et transformation d’un immeuble de bureaux en hôtel 4* (48 chambres).

PARIS - HOTEL PULLMAN MONTPARNASSE
19 rue du Commandant René Mouchotte
en cours
For :
UNIBAIL RODAMCO
With :
MVRDV - SRA
51 200 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFO
Description :

Rénovation d’un ensemble hôtelier (Hôtel IGH et ERP).

JOUY EN JOSAS - DOMAINE DU MONTCEL
3 rue de la Manufacture des Toiles de Jouy
2017
For :
ACAPACE
With :
2BDM Architecture
12 600 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCGTBPLB
Description :

Restructuration des locaux de l’ancienne Fondation Cartier avec extension, bâtiment inscrit à l’inventaire des Monuments Historiques.

ORGEVAL - NOVOTEL
482 Route de Quarante Sous
2014
For :
ALTAREA COGEDIM
With :
SO
5 200 m² SU
Missions :
Audit de l'immeuble
TIGNES - CLUB MED
Val Claret
2013
For :
AMUNDI
With :
SO
13 400 m² SU
Missions :
Audit de l'immeuble
Lots processed :
ASCCFACFOCVCPLB
PARIS - CHAUVEAU LAGARDE
12 rue Chauveau Lagarde
2008
For :
ARCADE
With :
AGENCE BLEAS
1 400 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Rénovation de l’hôtel

PARIS - RESIDENCE ADVENIAT
10 rue François 1er
2009
For :
STE SAINT LOUP
With :
CABINET LE MOAL
1 500 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
ASCCFACFOCVCPLB
Description :

Rénovation d’une résidence hôtelière.

NANTES - BLU RADISSON
6, place Aristide Briand
2011-2012
For :
AXA
With :
DTACC
10 9000 m² SU
Missions :
Missions d'assistance technique à maîtrise d'ouvrage
Lots processed :
CFACFO
Description :

Transformation d’un palais de justice en hôtel 4* (bâtiment atypique).

PARIS - COMMANDEUR
3 bis rue du Commandeur
2010
For :
CONGREGATION DES FILLES DE LA SAGESSE
With :
CABINET LE MOAL
1 000 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Rénovation d’une résidence hôtelière.

PARIS - CHAMPS ELYSEES
127 avenue des Champs-Elysées
suspendue
For :
IMMOBILIERE DASSAULT
With :
B. ARCHITECTURE
2 500 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCDesGTBPLB
Description :

Restructuration lourde et extension de commerces sous un immeuble de bureaux – travaux en site occupé.

PARIS - CARROUSEL DU LOUVRE
99 rue de Rivoli
2010
For :
VIPARIS
With :
SO
19 100 m² SU
Missions :
Audit et maîtrise d'œuvre technique
Lots processed :
CFOCVC
Description :

Remplacement poste haute tension et mise à niveau de production de froid – travaux en site occupé.

LA DEFENSE - CENTRE COMMERCIAL LES 4 TEMPS
Parvis de la Défense
2011
For :
UNIBAIL RODAMCO
With :
SO
108 000 m² SU
Missions :
Maîtrise d'œuvre technique
Lots processed :
CFO
Description :

Remplacement des groupes électrogènes de sécurité

PARIS - SAINT HONORE
54-60 rue du Faubourg St Honoré
2011
For :
HAMMERSON
With :
Studios JJ ORY
3 500 m² SU
Missions :
Audit Technique préalable à l'acquisition Maîtrise d'Oeuvre Technique
Lots processed :
ASCCFACFOCVCPLB
Description :

Restructuration des coques commerces – travaux en site occupé.

PARIS - GALERIE DES CHAMPS ELYSEES
88 avenue des Champs Elysées
2011
For :
SFL
With :
J. NOUVEL - SRA
8 000 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Restructuration lourde de la galerie commerciale et maintien en activité de la galerie.

PARIS - CENTRE COMMERCIAL ITALIE 2
Place d'Italie
2013
For :
HAMMERSON
With :
L35 -STUDIO JJ ORY
4 500 m² SU
Missions :
Audit et assistance technique - Maîtrise d'œuvre technique
Lots processed :
CFACFOCVCPLB
Description :

Réaménagement de cinémas en commerces et mise en conformité du désenfumage du mail – travaux en site occupé.

PRE SAINT GERVAIS - CANOPY
17 rue Lazare Carnot
2018
For :
NEXITY
With :
PCA STREAM
6 600 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCGTBPLB
Description :

Construction d’un immeuble neuf de bureaux

BOULOGNE - IN & OUT
44 - 47, quai Alphone Le Gallo
2013
For :
SFL
With :
DTACC
35 000 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCPLB
Description :

Restructuration et extension de bureaux

PARIS - FAUBOURG SAINT-HONORE
128 rue du Faubourg Saint Honoré
en cours
For :
COLLIERS INTERNATIONAL
With :
YM ARCHITECTURE
5 400 m² SDP
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCGTBPLB
Description :

Restructuration d’un immeuble de bureaux

PARIS - RIVOLI SAMARITAINE
Rue de Rivoli
en cours
For :
LOUIS VUITON MALLETIER
With :
ART DESK
7 600 m² SU
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCGTBPLBSPK
Description :

Aménagement des bureaux pour la direction immobilière de Louis Vuitton Malletier en immeuble ERP classé.

PARIS - GALILEE / VERNET
61 rue Galilée / 21-23 rue Vernet,
en cours
For :
FONCIERE SAINT-JAMES
With :
DTACC
4 400 m² SDP
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCDesGTBPIPLBSPK
Description :

Restructuration d’un immeuble de bureaux

MONTIGNY LE BRETONNEUX
7, rue George Stephenson
en cours
For :
AKERA
With :
STUDIOS ORY
11 250 m² SDP
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCCFACFOCVCDesGTBPLBSPK
Description :

Construction d’un immeuble neuf de bureaux, projet réalisé en BIM.

PARIS - IBOX
5-9 rue Van Gogh
2019
For :
GECINA
With :
DTACC
20 000 m² SDP
Missions :
Maitrise d'oeuvre technique
Lots processed :
ASCASCCFACFACFOCFOCVCCVCGTBGTBPIPIPLBPLB
Description :

Restructuration et extension de bureaux (immeuble IGH).